Dekap
Hotel lobby metalwork by Dekap

Work / Hospitality / Hotels

Hotels

Boutique, grand and resort hotels, from a single signature lobby moment to a complete coordinated metal package across every floor. We read the brand standard, hold it, and protect it.

(01)

What we make for hotels

Public spaces, circulation, guest rooms and the details guests touch a thousand times.

Arrival

Reception & Lobby

Reception desks, concierge counters, feature walls and lobby metal, the first surface a guest meets.

Circulation

Lifts & Wayfinding

Lift-car interiors, door surrounds, signage and wayfinding in a consistent PVD finish.

Guest rooms

Suites & Rooms

Wardrobe and joinery trim, minibar and vanity details, mirror frames and bedside fittings.

Hardware

Door-Hardware Package

Door pulls, levers, hinges and ironmongery, series-produced to one finish across hundreds of doors.

F&B within

Bars & Restaurants

In-hotel bars and dining metal, see Bars and Restaurants.

Wellness

Spa & Pool

Water-contact finishes for the spa and pool areas, see Wellness & Spa.

Pieces we make for hotels
Reception deskConcierge deskBell & luggage standFeature wallsLobby screensLift car claddingLift portalsDoor surroundsRoom numbers & signageWayfindingDoor pulls & leversHinges & ironmongeryKick & push platesWardrobe railsMinibar & vanity trimMirror framesLuggage racksTowel rails & robe hooksBalustrades & handrailsPlanters

One brand-standard finish across the property: 19 PVD colours and 8 surface finishes, repeatable across thousands of pieces. Build a finish on Materials →

(02)

What a hotel demands

Why operators and fit-out contractors bring hotel metalwork to us.

One finish, property-wide
A single brand-standard PVD colour and finish held consistent across reception, lifts, hundreds of doors and every guest room.
High-traffic durability
Surfaces and hardware engineered for constant guest contact, with the optional anti-fingerprint treatment on the pieces hands meet most.
Series production, repeatable
Door-hardware and room packages produced to one finish across the property, and re-orderable for later phases.
Spec & compliance
Substrate, finish and fire/compliance documentation to the FF&E spec, with samples signed off before production.
Coordinated to the opening date
Delivered to the main contractor's programme and the hotel's opening date, with installation coordinated on site.
(03)

Selected hotel work

Hotels

Opening or refurbishing a hotel?

Begin a conversation